🏥 Hospital Infrastructure

HIPAA-Compliant Clinical Data Centers

N+1/2N redundant infrastructure with ICRA compliance, clean agent fire suppression, and air-gapped DarkDeck AI for clinical workflows—built so patient data never leaves your control.

HIPAA Compliant ICRA Certified99.99% uptime SLA
Clinical-grade hospital data center with HIPAA compliance

Clinical Data Center Options

HIPAA-compliant, ICRA-certified hospital infrastructure with N+1/2N redundancy, clean agent fire suppression, and regulatory documentation boards expect.

Option A — "Pilot Core"

1 clinical floor + research + DarkDeck on-prem pilot

~$2.2M
±20%

Specifications

  • IT Load: 120 kW usable (expandable to 150 kW)
  • Racks: 12 racks (42–48U) with hot-aisle containment
  • Power: 2× 300 kVA lithium-ion UPS (N+1), 500 kW diesel generator
  • Cooling: 6× in-row DX/CRV units (~20 kW each), 200 kW total capacity
  • Fire Safety: VESDA + FK-5-1-12 clean agent + pre-action sprinkler
  • Security: Mantrap w/ biometric + 8× 4K cameras + SIEM integration

Cost Breakdown

Electrical power path$900K
Cooling + containment$500K
Fire/life safety$180K
Security/DCIM/BMS$150K
Racks/cabling/MMR$250K
Design, permits, commissioning$220K

Compliance & Standards

HIPAA AlignedICRA CompliantNFPA 75/76ASHRAE TC9.9NEC 70/645UL 2200

🤖 DarkDeck.ai On-Premise Installation

HIPAA-compliant private AI assistant for clinical workflows—runs entirely on your infrastructure with zero cloud connectivity. Diagnose edge cases, query patient data, and generate clinical documentation without compromising confidentiality.

Annual LicensingIncluded in build
12-Week Pilot Program+$500K (optional)

Pilot includes on-site deployment, clinical workflow integration, and 12 weeks of concierge fine-tuning. Learn more →

Option B — "Primary DC Pod"

Hospital primary compute + imaging/PACS + multi-dept DarkDeck

$4.7–5.2M
True concurrent maintainability

Specifications

  • IT Load: 250–300 kW usable, 24 racks (expandable to 30)
  • Power: 2N UPS (2× 400–500 kVA), 2× 750 kW generators (N+1)
  • Cooling: N+1 chilled water (500–600 kW chillers), rear-door HX on high-density racks
  • Fire Safety: VESDA + FK-5-1-12 zoning + dual-interlock pre-action
  • Security: Two-door mantrap w/ anti-tailgate, 12× cameras with analytics
  • Network: 400 GbE backbone, dual MMRs, private dark fiber to imaging/ORs
  • Density: General rows 8–12 kW/rack, DarkDeck/HPC rows 20–40 kW/rack

Cost Breakdown

Power path (2N UPS + dual gens)$2.0M
Cooling plant (N+1 chillers)$1.3M
Fire/life safety$300K
Security/DCIM/BMS$250K
Racks/containment/cabling$500K
Design, peer review, IST, commissioning$750K

What Hospitals Expect

  • Design basis & one-line (A/B, 2N/N+1 clearly shown)
  • Sequence of operations: power, clean agent, CRAC/CRAH
  • ICRA plan with infection control barriers
  • Short-circuit/coordination & arc-flash study
  • Integrated Systems Test (IST) + 4-hr witnessed load test
  • NEC 70/645, NFPA 75/76, ASHRAE TC9.9 references

🤖 DarkDeck.ai On-Premise Installation

HIPAA-compliant private AI for multi-department clinical operations. Query EHR data, generate clinical documentation, and analyze imaging results—all without cloud exposure.

Annual LicensingIncluded in build
12-Week Pilot Program+$500K (optional)

Pilot includes enterprise deployment, department-specific fine-tuning, and EHR integration. Learn more →

⚠️ Build Notes (So You Don't Get Burned)

  • Prefer lithium-ion UPS (smaller, cooler, longer life) unless policy forces VRLA
  • Specify hot-aisle (not cold-aisle) containment for hospital O&M simplicity
  • Require factory witness tests on UPS/gens; include spares kit in contract
  • Put growth stubs in—extra breakers, empty chiller pad, spare conduits, blank rear-door manifolds

Let's design your hospital infrastructure

We'll audit your current workloads, size the ideal hardware footprint, and hand you the execution plan we'll deliver end-to-end.